BLOG

Stay tuned to all the latest news from Risk Management

CONTACT US

Sponder, Derby

October 2021

Ground Investigation to inform ground and ground water conditions for the design and construction of the main and associated infrastructure.

READ MORE

Rickmansworth, Hertfordshire

September 2021

Risk Management Limited were commissioned to undertake a Phase II Site Investigation to inform the design and demolition of existing buildings and construction of 6 new industrial units with external hardstanding.

READ MORE

West Norwood, London

August 2021

Risk Management Limited were commissioned to undertake a Phase II Site Investigation to inform the design and erection of a 2 No. blocks of 3-storey properties, including roof terraces with an attached commercial unit to one of the terraces with associated car parking.

READ MORE

Bourneside, Wentworth

August 2021

Risk Management Limited were employed to undertake a Phase II Site Investigation at an existing building to inform the design and erection of a detached, two-storey, replacement dwelling with basement served by a vehicular access ramp.

READ MORE

Roebuck Retail Park, Stevenage

July 2021

Risk Management Limited were employed on behalf of Craddys to undertake a Phase I, Phase II Site Investigation at an existing retail park to inform the design and construction of additional units.

READ MORE

Sundon Reservoir, Bedfordshire

June 2021

Risk Management Limited were employed on behalf of Affinity Water to undertake a Phase II Site Investigation at an existing reservoir to inform the design and construction of a new water condition plant.

READ MORE

Sparsholt, Hampshire

May 2021

Risk Management Limited were instructed to undertake a Phase I Desk Study/Tier 1 Preliminary Risk Assessment and a Phase II Site Investigation at an agricultural plot of land for the development of 7 No. low-rise residential buildings.

READ MORE

South Kilburn, London

April 2021

Risk Management Limited were commissioned by Brent Council to undertake a Phase I Desk Study/Tier 1 Preliminary Risk Assessment and a Phase II Intrusive Site Investigation in South Kilburn, London for the construction of 16 No. 4-story residential terraced buildings.

READ MORE

Harefield Reservoir, Middlesex

April 2021

Risk Management Limited were employed on behalf of Affinity Water to undertake a Phase II Site Investigation at an existing reservoir in order to assess the geotechnical, geo-environmental, geological and hydrogeological ground conditions.

READ MORE

Oxhey Woods Reservoir, Middlesex

March 2021

Risk Management Limited were employed on behalf of Affinity Water to undertake a Phase II Site Investigation at an existing reservoir in order to assess the geotechnical, geo-environmental, geological and hydrogeological ground conditions.

READ MORE

Cullompton, Devon

March 2021

Risk Management Limited were instructed to undertake a Phase I Desk Study/Tier 1 Preliminary Risk Assessment and a Phase II Site Investigation at a parcel of land for the development of Cricket, Hockey, Tennis and Petanque pitches in Cullompton, Devon.

READ MORE

Poole, Dorset

February 2021

Risk Management Limited were initially employed in January 2020 to undertake a Phase I Desk Study/Tier 1 Preliminary Risk Assessment and Phase II Intrusive Contamination Assessment at the former site of HMRC offices in Poole, Dorset. Following this RML were again employed in February 2021 to undertake two deep cable percussion boreholes.

READ MORE

Littlehampton, West Sussex

January 2021

Risk Management Limited were employed to undertake winter groundwater monitoring at a site in Littlehampton, West Sussex for a furfure residential development.

READ MORE

Southampton, Hampshire

December 2020

Risk Management Limited were instructed to undertake a Phase I Desk Study/Tier 1 Preliminary Risk Assessment and a Phase II Site Investigation at The National Oceanography Centre in Southampton for the proposed erection of PV Panel Car Ports to external car parking areas.

READ MORE

Mitcham, Surrey

November 2020

Risk Management Limited were instructed to undertake a Phase I Desk Study/Tier 1 Preliminary Risk Assessment and a Phase II Site Investigation at a former rag & metal merchants in Mitcham, Surrey for the redevelopment into 25 self-contained residential units.

READ MORE

Hunstanton, Norfolk

October 2020

Risk Management Limited were employed to undertake a Phase I Desk Study/Tier 1 Preliminary Risk Assessment and a Phase II Site Investigation at a former infant school in Hunstanton, Norfolk for the redevelopment into residential accommodation.

READ MORE

Mottingham, London

September 2020

Risk Management Limited were commissioned to undertake a Phase I Desk Study/Tier 1 Preliminary Risk Assessment and a Phase II Intrusive Site Investigation in Mottingham, London for the construction of a part 5-story part 6-storey residential building.

READ MORE

Welwyn, Hertfordshire

August 2020

Risk Management Limited were instructed to undertake an intrusive site investigation across an Industrial Estate in Welwyn, Hertfordshire in order to assess the ground conditions due to excessive movement in the road surfacing.

READ MORE

Sonning, Berkshire

July 2020

Risk Management Limited were instructed to undertake a Phase I Desk Study/Tier 1 Environmental Risk Assessment and a Phase II Site Investigation at a residential property in Sonning, Berkshire.

READ MORE

Penge, London

June 2020

Risk Management Limited were employed to undertake a Phase II Site Investigation to assess potential heave and enable new foundations for a side and rear extension to be designed by others.

READ MORE

Chessington, Surrey

May 2020

Risk Management Limited were instructed in May 2020 to undertake an intrusive soil investigation to provide information to allow the Consulting Engineer to assess reasons for subsidence at a warehouse unit in Chessington, Surrey.

READ MORE

Blackford to Ickenham

April 2020

In April 2020 Risk Management Limited were instructed by Affinity Water to undertake an intrusive soil investigation to determine the proposed route for a 700mm diameter mains between Blackford Booster and Ickenham Booster.

READ MORE

Bletchingley, Surrey

March 2020

Risk Management Limited were instructed to undertake BRE 365 soakage tests and CBR testing at a playground in Bletchingley, Surrey in March 2020.

READ MORE

River Stour, Sandwich

February 2020

Risk Management Limited were commissioned to undertake a borehole investigation in February 2020 either side of the River Stour in Sandwich for a proposed new pipeline crossing.

READ MORE

Petersfield, Hampshire

January 2020

Risk Management Limited were instructed in January 2022 to undertake both a Phase I Desk Study and a Phase II Intrusive Site Investigation for a proposed residential ‘extra care’ facility and a ‘day-care’ centre in Petersfield, Hampshire.

READ MORE

Kentish Town, London

December 2019

Risk Management Limited were initially employed in June 2015 to undertake a Preliminary Contamination Assessment at a former coachworks and vehicle repair garage in Kentish Town, London. RML were subsequently employed to undertake an additional Contamination Assessment to provide further information.

READ MORE

Retail Park, Coventry

November 2019

Risk Management Limited were commissioned to undertake a Warehouse Slab Investigation at a Retail Park in Coventry.

READ MORE

Eel Pie Island, Twickenham

October 2019

Risk Management Limited were instructed to undertake a simple site investigation at a property located on Eel Pie Island located in the River Thames at Twickenham.

READ MORE

Limehouse Cut

September 2019

Risk Management Limited were commissioned to undertake Trial Pits against existing foundations at basement and ground floor level across a Grade II listed warehouse in Limehouse Cut.

READ MORE

Romsey, Hampshire

August 2019

Risk Management Limited were employed to undertake both a Phase I, non-intrusive, Desk Study and a Phase II, intrusive, Site Investigation at a large parcel of land in Romsey, Hampshire.

READ MORE

Whitehawk Bus Depot, Brighton

July 2019

Risk Management Limited were commissioned by Derek Lofty & Associates to provide information on the existing slab and sub-soil conditions at Whitehawk Bus Depot in Brighton.

READ MORE

Brixton, South London

June 2019

Risk Management Limited were employed to undertake intrusive work at a Primary School in Brixton, South London to provide the Consulting Engineers, Pellings LLP, information on the existing structure.

READ MORE

Winchester, Hampshire

May 2019

Risk Management Limited were employed by local developer Alfred Homes to undertake a full BRE 365 Soil Infiltration Test at a property in the village of Weeke, Winchester.

READ MORE

Chesham, Buckinghamshire

April 2019

Risk Management Limited were commissioned to install 2 No. deep borehole Soakaway installations for a new care home in Chesham, Buckinghamshire. 

READ MORE

Merton, Surrey

March 2019

Risk Management Limited were commissioned to undertake a Phase II, intrusive, Site Investigation at an existing Warehouse in Merton, Surrey.

READ MORE

Ashby-De-La-Zouch, Leicestershire

February 2019

Risk Management Limited were instructed to undertake a Land-Borne Gas Risk Assessment requested by North West Leicestershire District Council at a site of a former open-cast mine in Ashby-De-La-Zouch.

READ MORE

Ashford, Kent

January 2019

Risk Management Limited were commissioned to undertake a Phase II Site Investigation at a parcel of land in Ashford, Kent for a proposed Extra Care Facility.

READ MORE

Marketfield Way, Redhill

December 2018

Risk Management Limited were instructed to undertake a Phase I Desk Study and Phase II Site Investigation at a parcel of land adjacent to Redhill Train Station for a proposed multi-story residential development in the heart of Redhill town centre.

READ MORE

Tonbridge, Kent

November 2018

Risk Management Limited were commissioned by WCJ Structural Engineers to undertake a ‘heave assessment’ at a property in Tonbridge, Kent.

READ MORE

Sutton, Surrey

October 2018

Risk Management Limited work regularly with many local developers who often instruct us to undertake a ‘package’ consisting of a Phase I, non-intrusive, Desk Study and Phase II, intrusive, Site Investigation.

READ MORE

Gladstone Parade, Dollis Hill, London

September 2018

Risk Management Limited were commissioned to undertake a Phase I, non-intrusive, Desk Study and Walkover Survey together with a Phase II, intrusive, Site Investigation at a parade of shops in Dollis Hill, London.

READ MORE

Pear Tree Street, London

August 2018

Risk Management Limited were commissioned to undertake a Phase I, non-intrusive, Desk Study and Walkover Survey and Phase II, intrusive, Site Investigation at an existing National Grid Car Park.

READ MORE

Childrey Warren, Wantage

July 2018

Risk Management Limited were contracted to undertake an intrusive Site Investigation along the linear route for a new watermain running from Childrey Warren Water Treatment Works (WTW) to Lark Hill Reservoir for Thames Water.

READ MORE

Melior Place, London

June 2018

Risk Management Limited were contracted to undertake a Phase II, intrusive, Site Investigation at a warehouse unit in Southwark, London.

READ MORE