Merton, Surrey

POSTED ON: 15/03/2019

Risk Management Limited were commissioned to undertake a Phase II, intrusive, Site Investigation at an existing Warehouse in Merton, Surrey. The investigation comprised verification of the existing slab condition and surrounding ground conditions for a small Barrier Booth building adjacent to the warehouse. 

A concrete coring crew were subcontracted to core the existing warehouse slab in multiple locations with the resultant cores scheduled for Unconfined Compressive Strength testing. Drive-in-Sampler boreholes and MEXE Probe CBR tests were undertaken within the above-mentioned core holes to enable foundation design parameters. 