Risk Management Limited work regularly with many local developers who often instruct us to undertake a ‘package’ consisting of a Phase I, non-intrusive, Desk Study and Phase II, intrusive, Site Investigation with contamination assessment, gas/groundwater monitoring and an Interpretative Report.
This package was utilised at a site in Sutton, Surrey, where the intrusive investigation comprised one 7m deep borehole with in-situ SPT testing and 3 shallow drive-in-sampler boreholes. Subsequent permeability, gas/groundwater monitoring was undertaken along with two contamination tests including asbestos.
BACK TO POSTS