RML undertook a Ground Investigation for the purposes of informing ground and groundwater conditions along a linear route in Sponder, Derby for the design and construction of a new water main and associated infrastructure.
Intrusive fieldwork consisted of 14 No. Rotary core boreholes, 14 No. Dynamic Cone Penetration (DCP) tests and land-borne gas and groundwater monitoring.
Laboratory testing included asbestos identification, pH and sulphate tests, soil and groundwater contamination tests.
BACK TO POSTS