Risk Management Limited were commissioned to undertake Trial Pits against existing foundations at basement and ground floor level across a Grade II listed warehouse in Limehouse Cut.
The work involved undertaking twenty-three hand excavated Trial Pits, assisted by a mini-excavator with breaker at certain locations, to find column/pad undersides. Trial Pits were logged, photographed before backfilling and reinstating as per the existing make-up.
In addition 3 No. concrete cores were undertaken across the site to assess the slab structure.
BACK TO POSTS