Premier Inn Wembley Park

POSTED ON: 18/08/2023

RML were commissioned to carry out a Site investigation to provide information to assist in the repair or replacement of the existing car park construction owing to excessive settlement.  

Fieldwork

Fieldwork was undertaken in line with British Standards BS 5930:2015+A1:2020. 62 No. Dynamic Probe Tests (DPSH), 14 No. Drive-in-sampler boreholes and Reinstatement were undertaken as part of the investigation.

Ground Conditions

According to information published by British Geological Survey (BGS) the underlying geology at the site is shown as being Alluvium overlying London Clay of the Eocene Period.

Laboratory Testing

Chemical Analysis, Waste Acceptance Criteria (WAC) Tests and Asbestos Identification were the Laboratory tests undertaken for the project.