Risk Management Limited were commissioned to undertake a Phase II Site Investigation to inform the design and demolition of existing buildings and construction of 6 new industrial units with external hardstanding.
Intrusive fieldwork consisted of 3 No. Cable percussion boreholes, 6 No. drive-in-sampler boreholes, 6 No. MEXE probe tests, 1 No. Mechanically excavated trail prit, BRE 365 test, infiltration soil test and land-borne gas monitoring.
Laboratory testing included Natural moisture content tests, Atterberg tests, Quick undrained triaxial compression tests, Dynamic headspace analysis, Asbestos identification, pH and Sulphate tests, Soil contamination test and WAC tests.
BACK TO POSTS